Construction projects often represent some of the largest financial commitments made by a community association. Whether the project involves major repairs, renovations, restoration, infrastructure improvements, amenity upgrades, or hurricane reconstruction, legal guidance can help reduce risk and improve project outcomes.
In Southwest Florida, construction has also become a compliance issue. Milestone inspections and Structural Integrity Reserve Studies now identify repairs that condominium boards must fund and complete. Post-storm reconstruction runs through permitting rules, flood-zone limitations, and insurance timelines. And the contractor market that follows every hurricane brings its own hazards. Hamilton Mikes advises community associations throughout every phase of the construction process, from the first engineering report to the final release of lien.
Before the Contract Is Signed
The most expensive construction mistakes are made before work begins. We help boards:
- Confirm authority. Whether a project is maintenance, repair, replacement, or a "material alteration" determines who must approve it. Under Chapter 718, material alterations or substantial additions to the common elements require the approval of 75 percent of the total voting interests unless the declaration provides otherwise. Homeowners association declarations impose their own thresholds. We review the governing documents and document the board's authority before money is committed.
- Follow competitive bidding rules. Chapter 718 requires competitive bids for contracts that exceed five percent of the association's total annual budget, including reserves, with limited exceptions for emergencies and licensed professionals; Chapter 720 sets a ten-percent threshold for homeowners associations. A contract signed in violation of these rules invites owner challenges.
- Verify the contractor. Florida licenses contractors through the Department of Business and Professional Regulation, and a contract with an unlicensed contractor is generally unenforceable by the contractor. We verify licensure, insurance, bonding capacity, and litigation history.
- Negotiate the contract. Scope, drawings and specifications, price and allowances, payment schedule and retainage, schedule and liquidated damages, change-order procedure, insurance and indemnity, warranties, lien releases, termination rights, and dispute resolution: each term allocates risk. Associations routinely sign contractor-drafted forms that allocate all of it to the community. We rewrite them.
- Coordinate with the engineer. For SIRS- and milestone-driven work, the engineer's report defines the scope and the funding plan. We help boards align the construction contract, the reserve schedule, and any special assessment or loan so the project can be completed as designed.
During Construction
Once work begins, we help boards manage the project rather than react to it: reviewing pay applications against lien releases and the schedule of values, documenting delays and change orders, addressing defective or nonconforming work, handling permitting and inspection issues with the county or municipality, and communicating with owners about access, assessments, and timelines. Florida's Construction Lien Law (Chapter 713) allows subcontractors and suppliers who are not paid to lien the property, so the association's payment procedures must protect against paying twice.
Construction Defects and Turnover Claims
When the work is defective, Florida law prescribes the path. Chapter 558 requires an association to serve a detailed written notice of the claimed defects before filing suit, at least 60 days before filing (120 days for an association representing more than 20 parcels), and gives the contractor an opportunity to inspect and offer to repair or settle. The time to sue is limited: the statute of limitations for construction defect claims is four years and the statute of repose, shortened in 2023, is seven years from the applicable trigger date.
For newer communities, developer turnover raises additional claims. Chapter 718 imposes implied warranties on developers, contractors, and suppliers for condominium buildings, and the turnover process entitles the association to plans, permits, warranties, financial records, and a turnover audit. Hamilton Mikes represents associations in evaluating construction and turnover claims, preserving evidence, engaging engineers, pursuing pre-suit resolution, and litigating when necessary.
Hurricane Reconstruction
Reconstruction after a storm compresses every construction issue into a few weeks. Boards operating under statutory emergency powers must still contract carefully. Assignments of insurance benefits to contractors are no longer permitted for policies issued after January 1, 2023, roofing contractors are barred from certain solicitation practices such as offering to pay deductibles, and price-gouging statutes apply during a declared emergency. Two separate matters the firm handled for Windsor West Condominium Association after Hurricane Ian, against two different contractors, illustrate why boards should have counsel review restoration agreements before signing.
The first was the association's own claim against its roofer. In Windsor West Condominium Association, Inc. v. ShieldTech Roofing Solutions, LLC, No. 24-CA-750 (Fla. 20th Cir. Ct. Jan. 25, 2024), the association had executed an assignment of insurance benefits for roof replacement, and ShieldTech then demanded advance payments from the association. The firm sued on the association's behalf, and the court entered a $368,000 judgment against ShieldTech.
The second was a claim brought against the association by a different contractor. In Eco Roof & Solar, Inc. v. Windsor West Condominium Association, Inc., No. 23-CA-13235 (Fla. 20th Cir. Ct. Dec. 7, 2023), a mitigation and roofing contractor sued the association for $1.4 million. The firm defended the claim, and the matter settled for a nominal $25,000.
Both outcomes turned on the facts of those matters, including the contracts the association signed and the insurance in place. Past results do not predict the outcome of any other case.
Buildings in Special Flood Hazard Areas face a further constraint: when repair costs approach half of a structure's value, local floodplain rules may require the building to be brought into compliance with current elevation and construction standards. We coordinate with engineers, adjusters, and local building departments so boards understand these thresholds before committing to a repair scope.
Communities We Serve
Condominium Associations
We assist Condominium Associations with contractor agreements, material alterations, major repairs, reconstruction, turnover issues, engineering reports, construction defects, and project oversight.
Homeowners Associations
We advise Homeowners Associations (HOAs) regarding clubhouse renovations, roadway projects, drainage systems, developer turnover issues, amenity upgrades, and common-area improvements.
Clubs, Marinas, and Master Associations
Clubhouse and golf course renovations, seawall and dock reconstruction, and shared infrastructure projects raise cost-allocation, permitting, and environmental questions that ordinary construction contracts do not address. We structure these projects so that the entity paying for the work has the authority to direct it.
Frequently Asked Questions About Association Construction Projects
Does our condominium board need an owner vote to replace the roof?
Generally no. Replacing a roof with materials of like kind and quality is maintenance and repair, which the board may perform without an owner vote. Changing the design, materials, or appearance of the common elements may be a material alteration requiring 75 percent owner approval unless the declaration sets a different threshold. We review the specific scope before the board commits.
When does Florida law require competitive bids?
Condominium associations must obtain competitive bids for contracts exceeding five percent of the total annual budget, including reserves; homeowners associations must do so above ten percent. Emergencies and contracts with licensed professionals such as attorneys, accountants, architects, and engineers are excepted. The statute does not require the board to accept the lowest bid.
What is a Chapter 558 notice?
It is the written notice of construction defects that an association must serve on the contractor, subcontractor, supplier, or design professional before filing a lawsuit. The notice describes the defects in reasonable detail and starts a pre-suit period during which the recipient may inspect, test, and offer to repair or settle. Missing or deficient notices can delay or defeat a claim.
How long does our association have to sue for construction defects?
The statute of limitations is four years from the trigger dates set by statute, and the statute of repose bars claims not brought within seven years. Because these periods can begin running at completion or turnover rather than at discovery, associations that suspect defects should obtain an engineering evaluation promptly.
Can we sign a contract with a restoration company that offers to work directly with our insurer?
Only with careful review. Assignments of post-loss insurance benefits are prohibited for policies issued after January 1, 2023, and contractors who demand advance payment or offer to absorb deductibles may be violating Florida law. The association, not the contractor, should control its insurance claim.
What should the contract say about payment?
Payments should track actual progress verified by the engineer, be conditioned on partial lien releases from the contractor and its subcontractors, and hold retainage until final completion, a contractor's final payment affidavit, and final releases are delivered. These provisions protect the association from paying for work twice or paying for work never performed.