Florida's Condominium Safety Package: How the Inspection, Reserve, Insurance and Reporting Rules Fit Together

Current through the 2026 regular session. Milestone inspections, the reserve study, funding, insurance, Division reporting and fire safety, and what a board behind should do first.

This page is current through the 2026 regular session and states the law as of July 1, 2026. Since Surfside the Legislature has built a connected set of condominium safety obligations across two chapters, and boards struggle with them less because any one rule is hard than because the rules depend on each other. This page puts them in the order they actually operate, says which deadline governs which piece, and sets out what to do first if your association is behind.

What the package is, and which sessions built it

Four acts did the work, and no 2026 act added to them.

SessionActWhat it contributed
2022SB 4-D, Ch. 2022-269Created milestone inspections at § 553.899 and the structural integrity reserve study at § 718.112(2)(g); made reserves for study items non-waivable
2023SB 154, Ch. 2023-203Refined the milestone and study provisions and adjusted deadlines
2024HB 1021, Ch. 2024-244Condominium omnibus: records posting at 25 units, criminal records penalties, mandatory director education, manager obligations; further milestone and study refinement
2025CS/CS/HB 913, Ch. 2025-175Reserve threshold to $25,000, borrowing, the reserve pause, the study affidavit and the two 45 day duties, the Division online account, the 180 day financial report
2026NoneNo bill amending Chapter 718 as a governance matter passed; HB 657 died in Senate Rules

For the detail on any one piece, see our pages on milestone inspection changes and SIRS and reserve changes. This page is about how they connect.

The inspection tells you the condition

Section 553.899 requires a milestone inspection of a building three habitable stories or more in height as determined by the Florida Building Code that is subject to condominium or cooperative ownership. The first inspection is due by December 31 of the year the building reaches 30 years of age, measured from the certificate of occupancy, and every 10 years after. A local enforcement agency may require 25 years where local circumstances, including proximity to salt water, warrant it.

Phase one is visual. Phase two follows only if substantial structural deterioration is identified, and when it does, repairs must be commenced within 365 days after the association receives the report. Section 718.112(2)(h) puts the obligation squarely on the association: it must arrange for the inspection, it is responsible for ensuring compliance with § 553.899, and it bears the costs attributable to the portions of the building it maintains under the governing documents.

Both transitional catch-up deadlines have passed. A building that reached 30 years before July 1, 2022 was due by December 31, 2024. One that reached 30 between July 1, 2022 and December 31, 2024 was due by December 31, 2025.

The study prices it, and the reserve rules fund it

A structural integrity reserve study looks at the same building through a financial lens. Under § 718.112(2)(g)7., an association existing on or before July 1, 2022 under unit owner control had to have the study completed by December 31, 2025 for each building three stories or higher in height, and in no event may a study be completed after December 31, 2026.

Three funding rules then apply. The reserve item threshold is $25,000, or the Division's inflation-adjusted figure if greater, under § 718.112(2)(f)2.a. An association required to have a study may not waive or reduce funding for the items the study covers, under § 718.112(2)(f)2.b. And under § 718.112(2)(f)2.c.(I), reserves may be funded by special assessment, line of credit or loan on approval of a majority of the total voting interests, with sub-sub-subparagraph (II) providing that a milestone or study funding facility must be immediately available to the board without further member approval.

Two forms of relief exist, and both depend on the inspection. Section 718.112(2)(g)9. allows an association that has completed a milestone inspection to delay a required study for no more than the two consecutive budget years immediately following the inspection. Section 718.112(2)(f)2.e. allows an association that has completed a milestone inspection, on approval of a majority of the total voting interests, to pause or reduce reserve contributions for no more than two consecutive annual budgets to fund repairs the inspection recommended, and only for a budget adopted on or before December 31, 2028.

Turnover and the developer's side

For newer communities the safety rules start before the board is elected. Section 718.112(2)(f)2.f. provides that before turnover of control under § 718.301, a developer-controlled association may not vote to waive reserves or reduce reserve funding. That closed a practice that used to leave new boards with an empty reserve account on day one.

Section 718.301(4) lists what the developer must deliver at turnover, and the list now includes turnover inspection material and a structural integrity reserve study. A new board's first job is to check that list item by item against what it actually received, in writing, before the statutory turnover review deadlines run. What is missing at turnover tends to stay missing, and the cost of reconstructing it later falls on the owners.

If the building is new, the milestone clock has not started, but the study and reserve obligations have. Those are independent of building age.

Insurance adequacy and the three-year appraisal

Structural safety and insurance are the same subject with different paperwork. Section 718.111(11)(a) requires the association to use its best efforts to obtain and maintain adequate property insurance based on the replacement cost of the property to be insured, determined by an independent insurance appraisal, and the replacement cost must be determined at least once every three years.

Boards let that appraisal lapse more often than they miss any other item on this page, because nothing forces it. In a market where Southwest Florida construction costs have moved substantially, an appraisal that is four or five years old is not a technical violation so much as a live underinsurance problem: the association is buying a limit that no longer rebuilds the building.

Two related provisions belong on the same page of the board packet. Section 718.111(11)(c) requires the board to set deductibles at a properly noticed meeting, consistent with industry standards and prevailing practice for communities of similar size and age, and based on available funds and predetermined assessment authority. Section 718.111(11)(j) makes deductibles and damages in excess of coverage a common expense, with exceptions where an owner's conduct caused the damage. Read together, they mean the deductible decision is a funding decision. Our page on condominium insurance responsibilities works through the allocation.

Reporting: what the Division and the owners see

The 2025 act added visibility, which is what most changed the practical risk of falling behind.

  • The Division online account. Condominium and cooperative associations were required to create and maintain an online account with the Division on or before October 1, 2025, under § 718.501(3).
  • The study statement. Within 45 days of receiving a completed study, the association must tell the Division the study was completed and was provided or made available to owners, under § 718.112(2)(g)12.
  • Distribution to owners. Within the same 45 days, the study goes to owners or notice goes out that it is available, under § 718.112(2)(g)11., and an officer or director must sign an affidavit acknowledging receipt under § 718.112(2)(g)10.
  • The inspection report. Within 45 days of receiving the milestone report, the association distributes the inspector-prepared summary, posts a copy on the property, and publishes the full report and summary on its website if required to have one, under § 553.899(9).
  • The website. A condominium of 25 or more units with no timeshare units posts the items at § 718.111(12)(g)2. within 30 days of receipt or creation, which includes the milestone report and the study.

The consequence is simple: an association that is behind can no longer be quietly behind. The Division has a record, the owners have the documents, and a buyer's attorney can read the website.

Fire safety and the retrofit vote

Fire safety is the oldest piece of the package and the one least changed by the recent sessions. Section 718.112(2)(n) governs firesafety and the sprinkler retrofit question. A residential condominium is not obligated to retrofit the common elements, association property or units with a fire sprinkler system if the owners vote to forego the retrofitting by the affirmative vote of a majority of all voting interests. The vote is recorded in the public records and the result reported to owners.

Two practical points. A vote to forego is not permanent insulation from local fire code enforcement, and an engineered life safety system may still be required as an alternative. And an association whose owners voted years ago should confirm that the vote was recorded, because the recording is what makes it provable. This area interacts with Chapter 633 and with local fire officials, and it is worth a specific opinion rather than a general rule.

What to do first if your association is behind

Order matters more than speed. A board that funds before it knows the scope buys the wrong amount of money.

  1. Establish the story count in writing. Have a licensed engineer or architect apply the Florida Building Code definition and put the determination in the records. Everything else depends on it.
  2. Confirm the local trigger. Call the building department and ask in writing whether the 25 year coastal determination applies to your building, and whether any local timeline or penalty has been adopted.
  3. Complete the milestone inspection. If it is late, engage now and document the engagement. If a good cause extension is still possible, ask the local enforcement agency in writing.
  4. Complete the structural integrity reserve study and calendar December 31, 2026 as a board deadline. Confirm the scope in the engagement letter, including whether items like elevators, seawalls and parking decks are in or out.
  5. Do the administrative follow-through. Sign the affidavit, distribute within 45 days, file the Division statement within 45 days, and post to the website within 30 days.
  6. Then decide funding. Rebuild the reserve schedule at $25,000, price the phase two repairs, and choose among reserves, a special assessment and borrowing with the 365 day commencement clock in view.
  7. Refresh the insurance appraisal if it is more than three years old, and revisit deductibles in the same meeting.
  8. Tell the owners. A board that publishes a dated plan with the statutory citations keeps control of the narrative. A board that says nothing invites a recall.

Where the numbers are large, the decisions about scope, funding and communication should be made with counsel and the engineer in the same room. Our guidance on budgeting for structural repairs and on major project oversight covers how boards keep those workstreams aligned.

Frequently Asked Questions About Florida Condominium Safety Requirements

Did the 2026 session add any new condominium safety requirements?

No. No bill amending Chapter 718 as a governance matter passed in 2026, and § 553.899 was not amended. The omnibus, HB 657, passed the House on March 5, 2026 and died in Senate Rules on March 13, 2026. The 2026 chapter laws that reach associations are the Chapter 617 rewrite, the reviser's bill, an HOA architectural review provision, and an insurance act.

Which comes first, the milestone inspection or the reserve study?

Practically, the inspection. Both have their own deadlines, but a completed milestone inspection is what unlocks the two budget year study delay in § 718.112(2)(g)9. and the reserve pause in § 718.112(2)(f)2.e. An association that completes the inspection first preserves options that are lost if it does not.

Is the December 31, 2026 date a real cutoff?

Yes. Section 718.112(2)(g)7. says that in no event may a structural integrity reserve study be completed after December 31, 2026. The December 31, 2025 completion date has already passed for associations that existed on or before July 1, 2022 under owner control. There is no statutory relief beyond the outside date, so a board without a study should treat this as its most urgent item.

How often does our insurance appraisal have to be redone?

At least once every three years. Section 718.111(11)(a) requires adequate property insurance based on replacement cost determined by an independent insurance appraisal, with the replacement cost determined at least every three years. In a period of rising construction costs, an older appraisal usually means the association is underinsured rather than merely out of compliance.

Can owners vote to skip sprinkler retrofitting?

Section 718.112(2)(n) allows the owners of a residential condominium to vote to forego retrofitting by the affirmative vote of a majority of all voting interests, with the vote recorded in the public records and the result reported to owners. A vote to forego does not necessarily end the matter with local fire officials, and an engineered life safety system may still be required, so get a specific opinion before relying on an old vote.

What does the Division actually see?

More than it used to. Condominium associations had to create a Division online account by October 1, 2025 under § 718.501(3), and within 45 days of receiving a completed study the association must file a statement with the Division that the study was completed and made available to owners under § 718.112(2)(g)12. The milestone report and the study also go on the association's website under § 718.111(12)(g)2.

Contact Hamilton Mikes

Hamilton Mikes helps Southwest Florida condominium boards sequence the safety work: engineer engagement, inspection and study scope, funding decisions, owner communications and the filings that follow. Call 239-594-7227 or visit our Regulatory Compliance page.

Statutes and authorities referenced

  • § 553.899, Fla. Stat. (milestone inspections; three habitable stories; 30 and 25 year triggers; phase one and two; 365 day repair commencement; 45 day distribution and posting)
  • § 718.112(2)(h), Fla. Stat. (association responsibility for the milestone inspection and its costs)
  • § 718.112(2)(g)7., 9., 10., 11., 12., Fla. Stat. (SIRS deadlines; milestone delay; affidavit; two 45 day duties)
  • § 718.112(2)(f)2.a., b., c.(I) and (II), e., Fla. Stat. (threshold; waiver restriction; borrowing; reserve pause to December 31, 2028)
  • § 718.112(2)(f)2.f., Fla. Stat. (developer-controlled association may not waive reserves before turnover)
  • § 718.112(2)(n), Fla. Stat. (firesafety; sprinkler retrofit vote)
  • § 718.111(11)(a), Fla. Stat. (adequate insurance; replacement cost determined at least every 3 years)
  • § 718.111(11)(c), Fla. Stat. (deductibles set by the board)
  • § 718.111(11)(j), Fla. Stat. (deductibles and excess damages as a common expense)
  • § 718.111(12)(g)2., Fla. Stat. (website posting list; 30 day deadline)
  • § 718.301, Fla. Stat. (turnover; developer delivery obligations at (4))
  • § 718.501(3), Fla. Stat. (Division online account; October 1, 2025)
  • Session laws: Ch. 2022-269 (SB 4-D); Ch. 2023-203 (SB 154); Ch. 2024-244 (HB 1021); Ch. 2025-175 (CS/CS/HB 913)

We're ready to help

Speak with a Florida community association attorney

Tell us about your association and the legal challenge you are facing. Our team is ready to listen, respond, and help you identify a clear path forward.

239-594-7227 Info@HamiltonMikes.com
Hamilton Mikes, P.A.
8850 Terrene Court, Suite 110
Bonita Springs, FL 34135
How would you like to be contacted?

Fields marked * are required. Or call 239-594-7227.