A fence application is the most common piece of business an architectural committee handles, and it is also where associations most often lose. The reason is rarely the fence. It is that the committee applied a standard the declaration does not contain, ignored a survey problem, conditioned review on a permit it can no longer require, or wrote a denial that never identified the rule. Each of those is fixable before the application reaches the board.
Where the authority to review a fence comes from
Section 720.3035(1)(a) is the first thing to read. It says the association's authority to review and approve plans for structures or improvements is permitted only to the extent that the authority is specifically stated or reasonably inferred in the declaration of covenants as to location, size, type, or appearance, and that the association must reasonably and equitably apply and enforce the standards it does have.
That sentence does two jobs. It grants the authority and it caps it. If the declaration says nothing about fences and nothing about structures generally, the committee has no architectural jurisdiction over a fence, and no rule the board adopts afterward can manufacture it. A board rule can implement a covenant. It cannot create one.
So before a committee argues about picket versus panel, pull the declaration and answer three questions. Does it require approval for this category of improvement? Does it state a standard, or authorize published guidelines that state one? Were those guidelines adopted and distributed in the manner the declaration requires? A standard that lives only in a manager's binder is difficult to enforce and easy to attack. Our broader guide to architectural review procedures covers the committee's appointment, quorum and meeting obligations; this article assumes those are in order.
Height, material, setback and color
These are the standard fence variables, and each fails in a different way when the documents are thin.
- Height. A stated maximum, such as six feet in rear yards and four feet in side yards forward of the rear building line, is enforceable. A committee preference for four feet everywhere, applied to an owner whose neighbors have six, is not.
- Material. If the declaration lists aluminum, vinyl and wood, the committee may not add a material to the prohibited column by vote. It may not delete one either.
- Color and finish. Color is the easiest standard to state precisely and the one boards most often leave vague. "Neutral" and "harmonious with the community" are invitations to a fight. A named color list, or a rule tying fence color to the body or trim color of the home, gives the committee something to point at in a denial letter.
There is a related trap in section 720.3035(2). If the declaration or the published guidelines provide options for materials, size, design or location, the association may not restrict the owner from selecting among the options provided. Committees run into this when they have a three-material list but an unwritten preference for one of them. The owner who picks the least popular permitted material is entitled to it.
Surveys, property lines and the fence that is two feet off
A fence application without a survey is an application the association cannot actually evaluate. The committee is being asked to approve a structure at a location, and location is one of the four things section 720.3035(1)(a) lets the declaration control. Where the declaration authorizes review of location, requiring a recent boundary survey or a site plan drawn on one is a reasonable condition, and it protects the association as much as the owner.
The reason is the approval letter. When an association approves a fence "as shown on the submitted plan" and the plan is wrong, the fence ends up partly on a neighbor's lot, and the neighbor calls the association rather than a surveyor. Associations get drawn into private boundary disputes this way more often than any other.
The protection is language, and it belongs in every architectural approval, not only fences. Approval is of appearance and conformity to community standards only. It is not a determination that the improvement sits within the owner's boundaries, complies with building or zoning codes, or does not encroach on an easement. Put it in the approval letter and in the application form the owner signs.
Boundary correction is a matter between the two owners. The association's interest is narrower: whether the fence as built matches what was approved, and whether it crosses onto common area the association owns or maintains. Answer those promptly, because the longer a misplaced fence stands, the harder the removal conversation becomes.
Easements, and why an approval is not a license
Most Southwest Florida platted communities carry drainage and utility easements along rear and side lot lines, plus lake maintenance easements around retention ponds. A fence built inside one of those easements is a problem whether or not the committee approved it.
The easement holder, which may be the association, the district, a utility, or the county, keeps the right to enter and to remove obstructions. Nothing the architectural committee does changes that. An approval that ignores a platted easement does not waive it, but it does give the owner an equitable argument when the fence later has to come out, which is why approval letters need the disclaimer described above.
Where the association is itself the easement holder, the board has a policy choice to make once rather than repeatedly. Some boards prohibit any permanent structure in the easement. Some permit fences on a written agreement that the owner removes the fence at the owner's expense on notice and restores the area. Both are defensible. Deciding case by case is not, because that is how a selective enforcement defense gets built. Our guide to drainage easements covers the maintenance side of the same easements.
New for 2026: you cannot require the permit first
Chapter 2026-63, Laws of Florida, added section 720.3035(1)(c) effective July 1, 2026. An association, or any architectural, construction improvement, or other such similar committee of an association, may not require a building permit to be issued by a governmental authority to a parcel owner as a prerequisite for review by the association or committee concerning the construction of structures or improvements on the parcel.
This change matters most for fences, because a fence is the improvement most likely to need a county or city permit. Many application forms in Lee, Collier and Charlotte communities still carry a line requiring the owner to attach an issued permit before the committee will place the application on an agenda. As of July 1, 2026, that line is unenforceable and should come out of the form.
Two adjustments follow. Revise the application form and the committee's published procedures now, so the association is not enforcing a condition the statute voided. Then build the permit into the approval rather than the intake: an approval letter conditioning commencement of work on issuance of the county permit accomplishes everything the old intake requirement did, and it is consistent with the statute.
Pool barriers and the fence the owner has to build
A fence application tied to a new pool is a different animal, because the owner is not merely asking for a fence. Section 515.29, in the Residential Swimming Pool Safety Act, sets the barrier requirements: a barrier at least four feet high on the outside, with no gaps, openings, indentations, protrusions or structural components that would allow a young child to crawl under, squeeze through or climb over it, and gates that open outward away from the pool and are self-closing and self-latching with the release mechanism placed so a small child cannot reach it.
The consequence is that a denial can put the owner in an impossible position, and impossible positions are what courts remember. If the community standard caps fence height at three and a half feet and the pool code requires four, the standard has to give. The same is true of a picket-spacing rule that would leave a code-noncompliant gap.
Anticipate it instead. A committee that adopts a pool-barrier exception in its published guidelines, stating that barrier fencing may meet the minimum dimensions required by the Florida Building Code and Chapter 515 notwithstanding the general height and spacing standards while the material and color standards still apply, avoids the conflict entirely. Boards handling pool applications should also read our guide on pool rules and association risk.
Consistency with what the committee already approved
The strongest defense an owner raises against a fence denial is a photograph of a neighbor's fence. Section 720.3035(1)(a) requires the association to apply and enforce its standards reasonably and equitably. A committee that approved six-foot vinyl three times in two years and then denies the fourth has a problem it cannot argue its way out of at a hearing.
Before denying, ask what the committee has approved in this category in recent years and whether the file supports a distinction. Sometimes there is a real one: the earlier approvals were on interior lots and this one fronts a golf course, or the declaration was amended, or the earlier approvals were mistakes the board corrected by written policy, prospectively and with notice to the membership. Any of those can be defended. "This board feels differently" cannot.
Keep the record in a form that answers the question. An architectural log listing date, lot, improvement type, decision and the rule relied on turns a three-hour file hunt into a five-minute answer, and it is the same log that defeats a disparate-treatment claim. Our architectural review checklist lists the fields worth tracking.
Writing a denial that holds up
Section 720.3035(4)(a) sets the requirement plainly. If the association or the committee denies an owner's request or application for the construction of a structure or improvement, it must provide written notice stating with specificity the rule or covenant on which it relied and the specific aspect or part of the proposed improvement that does not conform to that rule or covenant. The same paragraph says the owner's rights under the declaration may not be unreasonably infringed or impaired, and section 720.3035(4)(b) allows an owner to recover damages, costs and reasonable attorney fees for unreasonable infringement.
A compliant denial has four parts, and they fit on one page.
- Identify the application by date, lot and improvement, and state the decision.
- Quote the operative sentence of the covenant or published guideline by section number. Not "Article VIII," but the sentence itself.
- State what specifically does not conform. "The proposed fence is 72 inches in height along the north side lot line forward of the rear building line, where Section 8.3 permits a maximum of 48 inches in that location."
- Say what would be approvable, if anything would be. The statute does not require it, and it resolves more applications than any other paragraph in the letter.
Two omissions cause most of the trouble: denials that cite a whole article rather than the operative provision, and denials that add a reason at the hearing which was not in the letter. If the committee has three grounds, all three go in the letter.
Finally, watch the clock. Many declarations contain a deemed-approval clause: if the committee does not act within thirty or forty-five days, the application is approved by default. A committee that meets quarterly and receives an application the week after a meeting can run out of time without anyone noticing, and a deemed approval is very difficult to undo. Calendar the deadline on receipt, and confirm the committee's authority to act between board meetings.
Frequently Asked Questions About HOA Fence Applications
Can our HOA require a county building permit before it will review a fence application?
No, not after July 1, 2026. Section 720.3035(1)(c), added by Chapter 2026-63, prohibits an association or its architectural or construction improvement committee from requiring that a building permit have been issued as a prerequisite for the association's review. The association may still condition the start of construction on the owner obtaining the permit, and may still treat unpermitted work as a violation.
Our documents do not state a fence setback. What controls?
The applicable county or municipal setback. Section 720.3035(3) provides that where the declaration or authorized published guidelines do not set specific setback limitations, the county or municipal limitations apply, and neither the association nor its committee may enforce a setback inconsistent with that governmental standard. The same subsection deems each parcel to have only one front for front-setback purposes unless the documents say otherwise.
An owner wants a permitted material we do not like. Can we deny it?
Generally no. Section 720.3035(2) provides that where the declaration or published guidelines give the owner options as to materials, size, design or location, the association may not restrict the owner from selecting among the options provided. If the association wants a shorter list, the route is to amend the documents or the published guidelines, not to deny the application.
Do we have to approve a fence that sits in a drainage easement?
No, and approving one is usually a mistake. The easement holder keeps the right to enter and remove obstructions regardless of what the committee approves. If the association is the easement holder and wants to allow fencing, do it by a uniform written policy requiring a removal and restoration agreement at the owner's expense, applied to every application rather than case by case.
Our height limit is lower than what the pool code requires. Which wins?
The safety requirement. Section 515.29 requires a residential pool barrier at least four feet high on the outside with no gaps or openings that would let a young child pass, and self-closing, self-latching gates opening away from the pool. A committee standard that makes compliance impossible will not survive. Adopt a written pool-barrier exception to your height and spacing standards instead.
What happens if the committee simply does not respond to an application?
Check your declaration for a deemed-approval clause. Many set a thirty or forty-five day window after which an unanswered application is treated as approved, and those clauses are enforced as written. Calendar the deadline the day the application is received, and if the committee cannot meet in time, confirm whether it may act by written consent or whether the board must act in its place.
Contact Hamilton Mikes
Hamilton Mikes helps Southwest Florida HOA boards and architectural committees rewrite application forms and published standards to match the 2026 statute, and reviews denial letters before they go out. Call 239-594-7227 or visit our Architectural Review page.
Statutes and authorities referenced
- § 720.3035(1)(a), Fla. Stat. (architectural review authority limited to what the declaration states or reasonably infers; reasonable and equitable application)
- § 720.3035(1)(c), Fla. Stat. (no building permit may be required as a prerequisite to association or committee review; added by Ch. 2026-63, eff. July 1, 2026)
- § 720.3035(2), Fla. Stat. (owner may select among options provided in the declaration or published guidelines)
- § 720.3035(3), Fla. Stat. (one front per parcel for setback purposes; county or municipal setbacks control where documents are silent)
- § 720.3035(4)(a), Fla. Stat. (written denial stating with specificity the rule relied on and the nonconforming aspect)
- § 720.3035(4)(b), Fla. Stat. (damages, costs and reasonable attorney fees for unreasonable infringement)
- § 720.305(1), Fla. Stat. (enforcement; prevailing-party attorney fees)
- § 515.29, Fla. Stat. (residential swimming pool barrier requirements)
- Ch. 515, Fla. Stat. (Residential Swimming Pool Safety Act)
- Ch. 2026-63, Laws of Fla. (CS/CS/HB 803), s. 11 (amending § 720.3035)